As the longest process within control system and switchgear manufacturing, wiring was a key area that Eplex identified must be improved to ensure enclosures are delivered in a timely manner. In this case study you can read how the swiss company turned to Eplan and Rittal to introduce automation to their production lines.
15/07/21 Off to a flying start with the AX enclosure!Meurer-etechnik looks to the new AX compact enclosure from Rittal to improve its production efficiency. How...
9/12/20 A new era for panel buildingThe pace of modern technology means panel builders have had to adapt and react faster than most other...
18/11/20 Integrated Value Creation in Control Cabinet ConstructionExclusively here on our blog, you can access the Rittal & EPLAN leadership talk on the "Integrated Value...
4/11/20 Digitalisation and Integration: sustainable efficiencyThe digital revolution has really taken off. It has changed not only the way we obtain information and...
28/10/20 Minimise The Misery of ModificationsLast-minute modifications are a panel builder’s nightmare. Whether they’re the result of the customer...
14/10/20 3 Tips for Efficient Data Exchange Between Engineering and ProductionGood cooperation between engineering and production is a crucial factor in completing projects to a deadline....